Industrial roof being assessed for repair or refurbishment

Industrial roof repair · refurbishment · replacement

Industrial Roofing

Industrial roofing projects involve more than choosing a membrane or coating. Roof condition, production activity, access, drainage, corrosion, hazardous materials and future asset plans all influence whether repair, refurbishment or replacement is appropriate.

01Condition first
02System compatibility
03Approved delivery

Direct answer

Industrial roofing covers the inspection, repair, refurbishment, waterproofing and replacement of roofs on factories, warehouses, production buildings and similar assets. Forti Nova supports the technical and material route, then appoints approved contractors where installation or project delivery is required.

Before we recommend work

Inspect the roof before choosing a product.

The defect, roof condition and building use determine the work required. We do not choose a product before understanding the building.

Roof and substrate

Identify the roof type, deck or sheet condition, existing finishes, insulation, rooflights, drainage and previous repair materials.

Operational constraints

Understand access, working areas, production risks, penetrations, fragile materials and sequencing requirements before selecting a route.

Asset strategy

Align local repair, phased refurbishment or replacement with the building's expected use, planned works and budget priorities.

When this route fits.

  • 01Factories, warehouses and commercial buildings with repairable or refurbishable roofs.
  • 02Metal, membrane and asbestos-cement roofs that need inspection before work is chosen.
  • 03Projects needing technical support, system supply and an approved-contractor route.

When it does not.

  • 01A coating-led proposal before the substrate and moisture condition are known.
  • 02Work that ignores structural, asbestos or fragile-roof controls.
  • 03A single generic specification applied across different roof areas without investigation.

How we deliver the work

From survey to installation.

We start with the roof problem, then select and supply the appropriate system. Where installation is required, we appoint approved contractors suited to the job.

01

Review drawings, images and known defects.

02

Arrange or evaluate roof-condition information.

03

Set repair, refurbishment or replacement priorities.

04

Coordinate materials, technical support and approved contractors.

Related services

Related services.

Start with the problem, inspect the roof and then agree the repair or refurbishment system.

Your roof. Your next step.

Show us the roof

Send the building location, photographs and what is happening. We will help define the most useful next step.